Who needs this service
This service is for investors and operators of renewable installations that must be connected to the grid before energy production can start. Work can begin with the application for connection conditions, with the conditions already issued by the operator, or with a draft connection agreement awaiting signature. A quotation is agreed before any work starts and a consultation is not required.
Connection conditions and the agreement
The connection agreement governs the relationship with the distribution system operator (OSD), covering in particular the deadline, the connection fee, the scope of works and liability, under article 7 paragraph 2 of the Polish Energy Law. Its function is separate from the sale or financial settlement of energy. Where a project covers both, we check that the connection deadlines are consistent with the date from which energy is to be delivered, and what follows from a delay.
Scope of the review
We compare the capacity, the connection point and the metering arrangements in the operator documents with the technical assumptions of the project. We set out the obligations of each party, the consequences of a delay on either side, the settlement of the connection fee and the rules for changing the agreed parameters. Where a question calls for a network study or a technical opinion, we say so instead of replacing it with a legal assessment.
Limits of the scope
Legal work does not include the technical design, a network study or the selection of protection equipment, and it does not guarantee that connection conditions will be issued. Preparing the technical application, obtaining permits or a generation licence and conducting proceedings or disputes require a separately agreed scope. Tax advice is agreed and priced separately.